Function available from version 1.13
A schedule is required when creating a target. The schedule defines times during the day and how much of the production we are aiming to achieve at that time.
When creating a new schedule
- The schedule name
- The schedule description
Once we have created a schedule, we can edit the points by clicking on the [>] icon.
- Press the arrow icon to close the editor.
- Name of the schedule
- The dropdown provides a quick way to initialize the schedule based on an existing shift. The schedule points will be set to 0% at the start of the shift and 100% at the end of the shift.
- The dot is a draggable point that defines the start of the target. The first point always needs to be set at 0%.
- Dragging somewhere on the line will create a new point at that location and will let you reposition it. This allows you to for example specify a break time by creating two new points at the same y coordinate (percentage complete).
- This is the end point, this is also draggable to adjust the end time of the schedule.